Registration is non-transferable. The Registration is valid during the specified period provided there have been no material changes in the Contractor’s / suppliers ability to meet the registration requirements. Registration shall be valid for a period of 5 years after which a Contractor/ supplier shall apply for renewal of registration within 60 days before the expiry date of registration.
The Contractor/supplier shall be responsible for maintaining the validity of all legally required registrations such as the CIDB, PKK, MoF and SPAN Registration and shall notify IWK of any changes affecting its IWK registration status.
All Contractors shall be required to obtain Licences from SPAN. All contractors carrying out sewerage works must possess this license. Applicants may be registered as Indah Water Contractor without this license. However they will not be allowed to carry out works without a valid license from (SPAN).
Contractor who do not hold valid SPAN license on being offered a contract will be required to obtain the relevant license within 14 days of award of the contract.
A Contractor’s registration is subject to review at any time to ascertain his eligibility to the present grade and category of registration. A Contractor must submit to IWK any information that may be required from time to time.
IWK reserves the right to deregister any Contractor/Supplier without giving notice or explanation.
At the same time IWK also reserves the right to remove from the IWK Register of Contractor/Suppliers any Contractor/Supplier who commits any of the acts listed below: